Showing posts with label environmental. Show all posts
Showing posts with label environmental. Show all posts

Thursday, April 4, 2013

Go Green -Palestinian Children's Museum


Palestinian first-graders sit with their schoolbooks during class in the West Bank city of Ramallah, Feb. 4, 2013. (photo by REUTERS/Mohamad Torokman)


In a land where space is limited, and public parks and gardens are few and far between, a Bethlehem-based mother of two is working on opening a museum for children — who comprise more than 40% of the Palestinian population — with a special focus on green living and sustainability.

Drawing inspiration from visits to children’s museums across the globe, Layla Kaiksow has a one-of-a-kind museum in mind for Palestinian children — one that can help them not only learn about sustainability and conservation, but also get them immersed in their culture away from the confines of the classroom.

“In Palestine, people are conscious of the environment in many ways, but in a lot of other ways they are not,” Kaiksow said. “Traditionally, Palestinians have not been a wasteful people, but as things ‘developed,’ trash became rampant and conservation isn’t exercised as it once was. We need to plant green ideas in children’s heads from the outset.”

Monday, March 11, 2013

Warga Asing dah mula mengamuk

"Nampaknya pendatang asing telah mula mendatangkan masalah di Semenanjung Malaysia, bukan sahaja di Sabah. Adakah Dato Seri Anwar Ibrahim akan dikaitkan juga dalam insiden rusuhan pendatang asing di bawah ini?

Pekerja mengamuk tuntut gaji minimum
10 Mac 2013 

MUAR - Kesabaran 150 pekerja warga asing di sebuah kilang di Parit Jamil dekat sini yang melancarkan mogok sejak kelmarin bagi menuntut kenaikan gaji minimum RM900 sampai ke penghujungnya apabila mereka bertindak memukul seorang pengurus pengeluaran dan tiga penyelia kilang semalam.

Dalam kejadian pukul 3 petang itu, mereka ditumbuk dan disepak oleh 20 pekerja.

Seorang pekerja kilang yang hanya mahu dikenali sebagai Ahmad, 33, mendakwa, kumpulan pekerja asing terbabit secara tiba-tiba memasuki pejabat kilang sebelum menarik keluar ketiga-tiga mangsa.

"Pada mulanya mereka hanya menarik pengurus dan ia disedari tiga penyelia kilang yang cuba membantu tetapi dihalang kumpulan pekerja terbabit.

"Keadaan menjadi tidak terkawal apabila sebahagian daripada mereka yang berada di luar pejabat membaling batu menyebabkan banyak tingkap pecah.

"Pihak pengurusan cuba memujuk mereka supaya berhenti daripada terus mengasari pengurus tetapi tidak berjaya malah suasana menjadi semakin tegang," katanya ketika ditemui.

Difahamkan, 700 pekerja tersebut sudah melancarkan mogok sejak kelmarin tetapi pihak majikan enggan melayan tuntutan mereka.

Kejadian itu dipercayai berpunca daripada rasa tidak puas hati pekerja apabila kilang berkenaan menangguhkan pelaksanaan penetapan gaji minimum yang sepatutnya bermula Januari lalu.

Dakwa Ahmad, ekoran kejadian itu, pihak pengurusan menghubungi polis dan pekerja asing terbabit bersurai selepas diarahkan polis.

Ahmad mendakwa, pengurus dan penyelia kilang berusia lingkungan 30-an yang mengalami kecederaan di badan dan lebam di muka sudah mendapatkan rawatan di Hospital Pakar Sultanah Fatimah di sini selain turut membuat laporan polis.

Sementara itu, usaha untuk mendapatkan ulasan pihak pengurusan kilang gagal atas alasan mahu menyelesaikan masalah itu secara dalaman.

Ketua Polis Daerah Muar, Asisten Komisioner Mohamad Nasir Ramli ketika dihubungi berkata, pihaknya akan menahan mereka yang terlibat dalam kejadian itu untuk siasatan lanjut dan kes disiasat mengikut Seksyen 147 Kanun Keseksaan kerana merusuh

Wednesday, December 19, 2012

Malaysia Is World Champion in Corruption



Washington 13/12/2012

Despite Malaysia's high-profile anti-corruption crusade, half of the corporate executives surveyed by a global corruption watchdog believe that competitors have obtained business in the country through bribery.

Transparency International said Malaysia scored worst in the 2012

Bribe Payers Survey.It asked nearly 3,000 executives from 30 countries whether they had lost a contract in the past year because competitors paid a bribe, and in Malaysia, 50% of them said 'yes'.
Second on the dubious honor roll was Mexico, which was at 48%.

According to the Wall Street Journal, Japan was ranked as the world's least-corrupt place to do business, with just 2% of respondents saying they had lost out due to bribery.

Malaysia's neighbour Singapore was second-cleanest, which was at 9%.

Even Indonesia, with a long-standing reputation for corruption, fared better than more-developed Malaysia.

By comparison, 27% of respondents in China said they thought bribes had cost them business, the report said.
"It shows the attitude of private companies in Malaysia, indicating that bribery in the public sector could be systemic and in a sense institutionalized," Paul Low, president of the Malaysian chapter of Transparency International, said.

How to choose Green Building Consultant in Malaysia



Criteria for green building consultant selection

There are many GB consultants in Malaysia market, which one should we choose? Current GBIf is nearly 600, and more new GB consultants are coming in market.

Selecting the right consultant or design team, regardless of project delivery method, is one of the most critical success factors in achieving a high performance green building and reaching green building rating.

Why building owner go for green building in Malaysia?
- requirement by authorities
- government incentives
- global trend, marketing , image
- environmental friendly, energy efficient building
- requirement by building operator or tenant



3 type of Green Building Consultant in Malaysia:-

Normal
- Just a Green Building consultant cum Green Building Coordinator , documents collector

Medium
- Capability in designing a green building , green building related calculation, simple simulation to meet GB requirement

Master
- capability on designing a high performance building, provided extensive calculation and simulation related to GB, ability in high performance and dynamic building simulation , ability to access various building design performance , interactive design process


The selection of the GB consultant will depend on:-
- cost / fee
- GB rating system and level
- getting the right consultant expertise and experience






Malaysia Local Green Building Rating System

There are many Green Rating System implemented in Malaysia, however currently, there are three Malaysia Local Green Building rating system:-


  • Green Building Index  by Green Building Sdn Bhd 
  • GreenPASS  by CIDB
  • pHJKR ( Penarafan Hijau JKR)


Green PASS is founded on the principle that a model standard must address building performance beyond those captured by rating systems or other evaluation guides, and therefore, it shall be  usable,  adoptable and stringent in making it an effective system for the construction industry.
Green PASS is founded on the principle that a model standard must address building performance beyond those captured by rating systems or other evaluation guides, and therefore, it shall be  usable,  adoptable and stringent in making it an effective system for the construction industry.





GreenPASS - 
detail link
Green Performance Assessment System in Construction (abbreviated Green PASS) is designed to meet these needs through standard conformance that promote sustainable construction in an integrated manner with other Construction Industry Standard (CIS). It is an independent construction standard that assesses and rates the impact of building construction upon the environment.




Penarafan Hijau JKR (pHJKR)

Kriteria Perancangan & Pengurusan Tapak Lestari (TL), Kriteria Pengurusan Sumber & Bahan (SB), Kriteria Kecekapan Tenaga (KT), Kriteria Pengurusan Kualiti Persekitaran Dalaman (PD), Kriteria Pengurusan Kecekapan Penggunaan Air (PA), Kriteria Sustainble Site Planning and Management (SM), Kriteria Environment & Water (EW), Kriteria Access & Equity (AE), Kriteria Construction Activities (CA), Kriteria Material & Resourse (MR) dan Kriteria Pavement Technologies (PT).




GBI is private driven & initiative. The first local GB rating system.  Applied about the same style as LEED from US. According to GBI, they stated the 100 points rating earlier than LEED. More focus to Energy Efficient. 

pHJKR currently apply for JKR and government building. The rating system is about the same with LEED, GBI style.

GreenPASS - standardized all green requirements to CO2 unit. Support PM commitment to reduce 40% carbon emission by 2020. It is an innovation in green building rating system. CIDB have done a comprehensive research and presented for comment from the world GB specialists. 


GO GREEN Malaysia



Monday, December 17, 2012

Kerajaan Negeri Selangor Sediakan Insentif Perkahwinan

MB belia insentif perkahwinan 01

Hanya kepada belia-belia sahaja...

SHAH ALAM, 16 DIS: Kerajaan Negeri Selangor akan menyediakan insentif perkahwinan kepada belia-belia Negeri Selangor yang mendirikan rumahtangga pada tahun hadapan.

Belia Selangor yang memenuhi syarat yang dijangka diumumkan tidak lama lagi bakal menerima RM 200 sumbangan dari Kerajaan Negeri.

Selain itu, mereka yang terlibat dalam program insentif perkahwinan ini juga bakal ditawarkan program perumahan yang dijalankan oleh Kerajaan Negeri.

Pengumuman tersebut dibuat Menteri Besar Tan Sri Abdul Khalid Ibrahim ketika melancarkan Majlis Perkahwinan Belia Mengikut Adat Resam Melayu Negeri Selangor yang diadakan di pentas utama Selangor Agrofest 2012, perkarangan Stadium Shah Alam hari ini.

“Insentif itu kita tak dapat mulakan kali ini sebab ia menggunakan peruntukan dari Belanjawan 2013 baru-baru ini, sebab itu kita mulakan mulai 1 Januari 2013.

“Dalam program itu juga nanti, Kerajaan Negeri akan membiayai dengan konsep perkongsian,” ujar Abdul Khalid.

Program yang dianjurkan Exco Adat Melayu, Belia dan Sukan itu meraikan 61 pasang pengantin dari seluruh Selangor yang mengadakan majlis mereka bertemakan adat resam Melayu Selangor.

Kos bagi pakaian dan majlis bagi setiap pasangan dibiayai sepenuhnya oleh Kerajaan Negeri.

Sementara itu, pengumuman Abdul Khalid itu mendapat reaksi positif dari beberapa pasangan pengantin yang ditemui TV Selangor.

“Pengumuman Tan Sri Abdul Khalid tadi betul-betul membuatkan kami terharu dan bangga kerana program ini dapat mengurangkan kos perkahwinan sebab belanja perkahwinan begitu tinggi dengan cara ini dapat meringankan beban.

MB belia insentif perkahwinan 04“Saya sebagai warga Selangor, mengucapkan ribuan terima kasih atas sumbangan dan penghargaan Kerajaan Negeri dengan mengadakan majlis ini,” ujar Hizami Burhanuddin dan pasangannya Ilyna Mohd Ghazali dari Klang.

Abdul Kahar Ahmad Marwai dan Siti Sara Azraie dari Kampung Delik Klang pula berpendapat majlis tesebut wajar diteruskan bagi menggalakkan masyarakat mengamalkan kesederhanaan dalam mengadakan majlis perkahwinan.

“Dapat meringankan beban kewangan sebab lepas ini kalau sebelah pihak perempuan atau pihak lelaki tak nak buat kenduri lagi pun tak apa, sebab dah selesai dah, yang penting akad nikah,” Abdul Kahar berkata.

Antara adat perkahwinan tradisi Melayu yang diketengahkan, termasuklah persembahan pencak silat, kompang dan bunga telur.

Pasangan juga ditrampilkan di dalam busana tradisional rakyat Selangor iaitu pakaian sikap Selangor yang dikenakan pengantin lelaki serta kebaya labuh yang digayakan pengantin perempuan.

MB belia insentif perkahwinan 03

Sumber
 

GBI Certified Building - NRNC

PTM GEO BUILDING

GBI RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0001
CERTIFICATION DATE24 July 2009
BUILDING CATEGORYNon-Residential New Construction (NRNC)

Pusat Tenaga Malaysia (Malaysia Energy Centre), previously known as ZEO (Zero Energy Office) Building is officially Malaysia’s first Green Building Index (GBI) Certified Building.
Now known as GEO (Green Energy Office) Building, it is also Malaysia’s first completed green-rated office building.
Planned as a showcase of energy-efficient building in 2005, it fulfilled this objective as the most energy efficient office building in the country, and in ASEAN, when completed.
Its impressive Building Energy Intensity of 35 kWh/m2/year is about a third of that of the previous most energy efficient building in the country, the LEO (Low Energy Office) Building of the now Ministry of Energy, Green Technology and Water.
Designed at a time when the awareness of building green is still at its infancy in this country, its energy efficient features scored full points under the Energy Efficiency and Innovation criteria of the GBI.
Click on thumbnails below to enlarge images

 

BANGUNAN SURUHANJAYA TENAGA

GBI RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0002
CERTIFICATION DATE21 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

1 FIRST AVENUE

GBI RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0003
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   

DIGI TECHNOLOGY OPERATION CENTRE, MALAYSIA

GBI RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0004
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   


NON-RESIDENTIAL NEW CONSTRUCTION (NRNC)
PROVISIONAL CERTIFIED BUILDINGS (DA)

KRC SALES GALLERY

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0001(P)
CERTIFICATION DATE26 April 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  


MENARA WORLDWIDE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0003(P)
CERTIFICATION DATE26 April 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE HORIZON PHASE 2
(TOWER BLOCK 1)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0006(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 2)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0007(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 3)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0008(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 4)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0009(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA BINJAI

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0010(P)
CERTIFICATION DATE30 December 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   

MENARA FELDA

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0011(P)
CERTIFICATION DATE27 January 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

GTOWER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0012(P)
CERTIFICATION DATE03 March 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

    

HOTEL PENAGA

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0013(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

    

ELKEN DISTRIBUTION CENTRE

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0014(P)
CERTIFICATION DATE23 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE SAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0015(P)
CERTIFICATION DATE23 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

SARAWAK ENERGY BERHAD

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0016(P)
CERTIFICATION DATE23 June 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE HORIZON PHASE 2
(TOWER BLOCK 7)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0017(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

THE HORIZON PHASE 2
(TOWER BLOCK 8)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0018(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


THE HORIZON PHASE 2
(TOWER BLOCK 9)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0019(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


THE HORIZON PHASE 2
(TOWER BLOCK 10)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0020(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

CSF COMPUTER EXCHANGE 5 (CX5)

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0021(P)
CERTIFICATION DATE11 November 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

OFFICE TOWER ON PLOT Z10

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0022(P)
CERTIFICATION DATE30 November 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


3 STAR HOTEL ON PLOT Z10

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0023(P)
CERTIFICATION DATE23 December 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


OFFICE BUILDING AT LOT 2C2

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0024(P)
CERTIFICATION DATE23 December 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


S P SETIA BERHAD CORPORATE HQ

GBI PROVISIONAL RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0025(P)
CERTIFICATION DATE15 January 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


POINT 92 OFFICE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0026(P)
CERTIFICATION DATE15 January 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

MENARA LGB

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0027(P)
CERTIFICATION DATE09 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


LOT E, PLATINUM SENTRAL, KL SENTRAL PARK, CORPORATE OFFICE SUITE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0028(P)
CERTIFICATION DATE09 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


REHDA HEADQUARTER

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0029(P)
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

NTT MSC TECHNOLOGY CENTER

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0030(P)
CERTIFICATION DATE09 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

NTT MSC CYBERJAYA3 DATA CENTER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0031(P)
CERTIFICATION DATE09 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA DARUSSALAM

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0032(P)
CERTIFICATION DATE04 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


SETIA CITY MALL

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0033(P)
CERTIFICATION DATE16 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


MYTELEHAUS CJI

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0034(P)
CERTIFICATION DATE16 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images
 

MENARA PEJABAT KEMENTERIAN PERDAGANGAN ANTARABANGSA DAN INDUSTRI (MITI)

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0035(P)
CERTIFICATION DATE06 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KL ECO CITY (SALES GALLERY)

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0036(P)
CERTIFICATION DATE04 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA PUBLIC MUTUAL 

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0037(P)
CERTIFICATION DATE07 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


ART GALLERY & CONSERVATION CENTRE, SABAH 

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0039(P)
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

UNIMAS STUDENT PAVILION

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0040(P)
CERTIFICATION DATE03 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


PROPOSED MOSQUE AT SECTION 13, SHAH ALAM

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0041(P)
CERTIFICATION DATE03 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

BOULEVARD SHOPLEX @ PJ CENTRESTAGE 

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0042(P)
CERTIFICATION DATE13 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

SETIA CITY CONVENTION CENTRE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0043(P)
CERTIFICATION DATE19 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KOMPLEKS KERJA RAYA 2 (KKR 2)

GBI PROVISIONAL RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0044(P)
CERTIFICATION DATE19 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


DIALOG HEADQUARTER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0045(P)
CERTIFICATION DATE27 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KAO PENANG OFFICE

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0046(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


VIVATEL

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0047(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

JAYA 33 (PHASE 2)

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0048(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


JAYA ONE THE NEXT PHASE - OFFICE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0049(P)
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


JAYA ONE THE NEXT PHASE - RETAIL

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0050(P)
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


DESIGNER SUITES @ PJ CENTRESTAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0051(P)
CERTIFICATION DATE24 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

SERVICE SUITEL @ PJ CENTRESTAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0052(P)
CERTIFICATION DATE24 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE PINNACLE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0053(P)
CERTIFICATION DATE28 September 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


MERCU MUSTAPHA KAMAL PHASE 3A

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0054(P)
CERTIFICATION DATE19 October 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
 
Click on thumbnails below to enlarge images


KL TRILLION - OFFICE TOWER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0054(P)
CERTIFICATION DATE12 November2012