Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST)



The Malaysian Carbon Reduction and Environmental Sustainability Tool (MyCREST) is a tool that guides construction industry players and stakeholders to design, construct and operate buildings that integrate low carbon and sustainable practices. A building that subscribes to MyCREST will be given certification based on points achieved. MyCREST was developed by taking into account the whole building life cycle starting from pre-design up to demolition stage.



These criteria are then implemented according to three certification phases: DESIGN, CONSTRUCTION AND OPERATION & MAINTENANCE. Depending on each phase, the criteria are adjusted for different requirements and relevance according to that particular phase.






Thursday, July 24, 2014

Name and Logo Design Competition for Malaysia National Green Building Assessment System

Name and Logo Design Competition for Malaysia National Green Building Assessment System




Introduction
The Green Building Rating Tool is a designed sustainable building rating system or tool that aims to quantify, hence reduce, built environment’s impact in terms of carbon emissions and environmental implications, while taking into account a more holistic life-cycle view of the built environment. It also aims to integrate socio-economic considerations relating to the built environment and urban development.

Objektif Pertandingan
Objektif pertandingan ini adalah untuk:
  • Merekacipta Nama bagi Sistem Penilaian Bangunan Hijau yang dibangunkan oleh Kementerian Kerja Raya, Jabatan Kerja Raya dan Lembaga Pembangunan Industri Pembinaan Malaysia.
  • Merekacipta Logo bagi Sistem Penilaian yang telah dinamakan.


Source Link

Tuesday, June 17, 2014

6 negeri sudah pinda UKSB Sistem Penuaian Air Hujan




KUALA LUMPUR 12 Jun - Hanya enam buah negeri telah mewartakan pindaan terhadap Undang-undang Kecil Bangunan Seragam (UKBS) mengenai Sistem Pengumpulan dan Penggunaan Semula Air Hujan atau Sistem Penuaian Air Hujan (SPAH) setakat ini.

Timbalan Menteri Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan, Datuk Halimah Mohamed Sadique berkata, negeri-negeri tersebut adalah Perak, Selangor, Johor, Melaka, Kelantan dan Perlis.
Beliau difahamkan, nege­ri lain akan turut mengambil langkah sama dengan mengambil kira beberapa pindaan UKBS sebelum mewartakannya.

Katanya, kelewatan bebe­rapa kerajaan negeri dalam menyesuaikan dan mewartakan pindaan UKBS mengenai SPAH sedikit sebanyak memberi kesan seperti berlakunya pembaziran air terawat yang sesuai diminum, membasuh kenderaan, mencuci lantai dan mencurah tandas.

"Sedangkan, untuk kegunaan-kegunaan tersebut boleh digunakan ajr hujan dan takungan SPAH. Perkara ini kerana SPAH merupakan salah satu amalan pengurusan terbaik dalam pengurusan air berkesan," katanya pada sidang Dewan Rakyat hari ini.

Beliau menjawab soalan Mohd. Fasiah Mohd. Fakeh (BN-Sabak Bernam) berhu­bung negeri-negeri yang tidak mewartakan pemasangan SPAH bagi kawasan pembangunan baharu sepertimana dipersetujui dalam Mesyuarat Negara bagi Kerajaan Tempatan (MNKT) pada 20 Mac 2012.

Dalam pada itu, Halimah berkata, tanpa pemindaan UKBS mengenai SPAH, kerajaan-kerajaan negeri tidak dapat mendukung pelaksanaan Dasar Teknologi Hijau di negara ini terutama dalam penggunaan air terawat.
Jelasnya, pelaksanaan SPAH boleh membantu memelihara sumber air dan penjimatan tenaga elektrik di loji-loji rawatan air serta penggunaan air hujan boleh mengurangkan bayaran bil-bil air sama ada kegunaan domestik, komersial mahupun industri.

"Penggunaan air hujan juga akan mengurangkan penggunaan air terawat, mengatasi masalah bekalan air dan seterusnya dapat memulihara sumber air dan mengurangkan kesan perubahan iklim," jelasnya.

Tuesday, June 10, 2014

Pertandingan Mereka Bentuk Sistem Pengumpulan Dan Penggunaan Semula Air Hujan (SPAH) Untuk Bangunan Kediaman (LANDED)

Kesejahteraan bandar sangat berkait rapat dengan bekalan kemudahan asas yang efisien termasuklah bekalan air bersih serta pengurangan pengeluaran karbon. Hasrat pembentukan bandar sejahtera dan mampan dinyatakan melalui pelaksanaan Garis Panduan Perancangan Kejiranan Hijau terbitan Jabatan Perancangan Bandar dan Desa Semenanjung Malaysia, Kementerian Kesejahteraan Bandar, Perumahan dan Kerajaan Tempatan. 

Bekalan air bersih semakin menjadi kritikal di kawasan bandar akibat fenomena perubahan iklim yang menjejaskan sumber bekalan air. 

Dalam usaha untuk mengurangkan pergantungan pada bekalan air paip, SPAH telah diperkenalkan supaya air hujan boleh menjadi sumber air pilihan. 

Walau pun pada masa kini telah terdapat pelbagai reka bentuk SPAH, masih terdapat peluang penambahbaikan agar reka bentuknya lebih cost effective, berinovasi dan praktikal.

Syarat Pertandingan:
i. Terbuka kepada individu warga negara Malaysia.
ii. Penyertaan adalah atas nama individu sahaja (bukan syarikat / perunding / kontraktor).
iii. Sistem yang dicadangkan adalah untuk rumah kediaman bertanah (landed) sahaja.
iv. Hasil penyertaan akan menjadi hakmilik penganjur (JPBD Semenanjung Malaysia).

Maklumat lanjut:


Monday, November 25, 2013

New Malaysia Green Building in Coming


The Malaysia government are working for new Malaysia Green Building Ratings System. The system will utilize the carbon emission as universal unit for the Green Criteria, however not all criteria can be convert to CO2 emission.

The situation in Malaysia is currently like the Halal Certification, the are more and more Green Rating System developed locally, not only GBI. Even Penang Authorities also come with their own Green Rating System. This might be because there are so many complaint on GBI. The authorities not really happy, then JKR have developed their own pHJKR, the developer also not really happy, REHDA developed GreenRE (RE stand for real estate, Penang Authority develop Penang Green Office, CIDB developed GreenPASS. Now is time to have the national rating system.




Monday, August 5, 2013

CSR - Solar Power System for Malaysia Schools


Sekolah Menengah Maxwell

Solar Photovoltaic Systems to 10 local schools. The Solar PV Systems donation kicks start with two schools in central Malaysia -- Sekolah Menengah Kebangsaan Damansara Jaya and Sekolah Menengah Maxwell, with eight other local schools in the different states benefiting from this eco education initiative within the year.

Satelite Image of klia2 Project from 2010 to 2013

Satelite Image of klia2 Project - 2010

Thursday, April 4, 2013

Go Green -Palestinian Children's Museum


Palestinian first-graders sit with their schoolbooks during class in the West Bank city of Ramallah, Feb. 4, 2013. (photo by REUTERS/Mohamad Torokman)


In a land where space is limited, and public parks and gardens are few and far between, a Bethlehem-based mother of two is working on opening a museum for children — who comprise more than 40% of the Palestinian population — with a special focus on green living and sustainability.

Drawing inspiration from visits to children’s museums across the globe, Layla Kaiksow has a one-of-a-kind museum in mind for Palestinian children — one that can help them not only learn about sustainability and conservation, but also get them immersed in their culture away from the confines of the classroom.

“In Palestine, people are conscious of the environment in many ways, but in a lot of other ways they are not,” Kaiksow said. “Traditionally, Palestinians have not been a wasteful people, but as things ‘developed,’ trash became rampant and conservation isn’t exercised as it once was. We need to plant green ideas in children’s heads from the outset.”

Monday, April 1, 2013

GreenRE - a new green building and carbon rating tool by REHDA





In an effort to evaluate a building’s eco-friendly features, the Real Estate and Housing Development Association of Malaysia (REHDA) has unveiled the Green Real Estate (GreenRE), a green building and carbon rating tool.

Minister of Energy, Green Technology and Water  Datuk Sri Peter Chin Fah Kui (far right) officiating the launch of GreenRE while Rehda president Datuk Seri Michael Yam and Tan look on.

Notably, GreenRE can gauge a project’s carbon emissions, water and energy efficiency, as well as indoor environmental quality. REHDA will also launch a residential version of the tool, said GreenRE’s Organising Chairperson Sam Tan, adding that commitments for pilot projects have already been received.

Monday, March 11, 2013

Warga Asing dah mula mengamuk

"Nampaknya pendatang asing telah mula mendatangkan masalah di Semenanjung Malaysia, bukan sahaja di Sabah. Adakah Dato Seri Anwar Ibrahim akan dikaitkan juga dalam insiden rusuhan pendatang asing di bawah ini?

Pekerja mengamuk tuntut gaji minimum
10 Mac 2013 

MUAR - Kesabaran 150 pekerja warga asing di sebuah kilang di Parit Jamil dekat sini yang melancarkan mogok sejak kelmarin bagi menuntut kenaikan gaji minimum RM900 sampai ke penghujungnya apabila mereka bertindak memukul seorang pengurus pengeluaran dan tiga penyelia kilang semalam.

Dalam kejadian pukul 3 petang itu, mereka ditumbuk dan disepak oleh 20 pekerja.

Seorang pekerja kilang yang hanya mahu dikenali sebagai Ahmad, 33, mendakwa, kumpulan pekerja asing terbabit secara tiba-tiba memasuki pejabat kilang sebelum menarik keluar ketiga-tiga mangsa.

"Pada mulanya mereka hanya menarik pengurus dan ia disedari tiga penyelia kilang yang cuba membantu tetapi dihalang kumpulan pekerja terbabit.

"Keadaan menjadi tidak terkawal apabila sebahagian daripada mereka yang berada di luar pejabat membaling batu menyebabkan banyak tingkap pecah.

"Pihak pengurusan cuba memujuk mereka supaya berhenti daripada terus mengasari pengurus tetapi tidak berjaya malah suasana menjadi semakin tegang," katanya ketika ditemui.

Difahamkan, 700 pekerja tersebut sudah melancarkan mogok sejak kelmarin tetapi pihak majikan enggan melayan tuntutan mereka.

Kejadian itu dipercayai berpunca daripada rasa tidak puas hati pekerja apabila kilang berkenaan menangguhkan pelaksanaan penetapan gaji minimum yang sepatutnya bermula Januari lalu.

Dakwa Ahmad, ekoran kejadian itu, pihak pengurusan menghubungi polis dan pekerja asing terbabit bersurai selepas diarahkan polis.

Ahmad mendakwa, pengurus dan penyelia kilang berusia lingkungan 30-an yang mengalami kecederaan di badan dan lebam di muka sudah mendapatkan rawatan di Hospital Pakar Sultanah Fatimah di sini selain turut membuat laporan polis.

Sementara itu, usaha untuk mendapatkan ulasan pihak pengurusan kilang gagal atas alasan mahu menyelesaikan masalah itu secara dalaman.

Ketua Polis Daerah Muar, Asisten Komisioner Mohamad Nasir Ramli ketika dihubungi berkata, pihaknya akan menahan mereka yang terlibat dalam kejadian itu untuk siasatan lanjut dan kes disiasat mengikut Seksyen 147 Kanun Keseksaan kerana merusuh

Tuesday, January 15, 2013

Landslides from around the world



largest landslides
largest landslides
largest landslides
largest landslides
largest landslides
largest landslides
biggest landslides
biggest landslides
biggest landslides
biggest landslides
biggest landslides
biggest landslides

Hukuman Rotan Seumpama Hudud Sebagai Rawatan Penagih Dadah Penagih Alkohol dan Nymphomaniacs


376581_007


























Drug-addicts, alcoholics and nymphomaniacs are treated in a special way – by a whip. People’s addictions are litterally whipped out.
One patient, whose name is Natalia, is addicted to heroine, she says it’s the only method that helps her to struggle her addiction. She is sure she would die without it.
People come there voluntarily and even pay for that. Each session costs 95 USD.

Wednesday, December 19, 2012

How to choose Green Building Consultant in Malaysia



Criteria for green building consultant selection

There are many GB consultants in Malaysia market, which one should we choose? Current GBIf is nearly 600, and more new GB consultants are coming in market.

Selecting the right consultant or design team, regardless of project delivery method, is one of the most critical success factors in achieving a high performance green building and reaching green building rating.

Why building owner go for green building in Malaysia?
- requirement by authorities
- government incentives
- global trend, marketing , image
- environmental friendly, energy efficient building
- requirement by building operator or tenant



3 type of Green Building Consultant in Malaysia:-

Normal
- Just a Green Building consultant cum Green Building Coordinator , documents collector

Medium
- Capability in designing a green building , green building related calculation, simple simulation to meet GB requirement

Master
- capability on designing a high performance building, provided extensive calculation and simulation related to GB, ability in high performance and dynamic building simulation , ability to access various building design performance , interactive design process


The selection of the GB consultant will depend on:-
- cost / fee
- GB rating system and level
- getting the right consultant expertise and experience






Malaysia Local Green Building Rating System

There are many Green Rating System implemented in Malaysia, however currently, there are three Malaysia Local Green Building rating system:-


  • Green Building Index  by Green Building Sdn Bhd 
  • GreenPASS  by CIDB
  • pHJKR ( Penarafan Hijau JKR)


Green PASS is founded on the principle that a model standard must address building performance beyond those captured by rating systems or other evaluation guides, and therefore, it shall be  usable,  adoptable and stringent in making it an effective system for the construction industry.
Green PASS is founded on the principle that a model standard must address building performance beyond those captured by rating systems or other evaluation guides, and therefore, it shall be  usable,  adoptable and stringent in making it an effective system for the construction industry.





GreenPASS - 
detail link
Green Performance Assessment System in Construction (abbreviated Green PASS) is designed to meet these needs through standard conformance that promote sustainable construction in an integrated manner with other Construction Industry Standard (CIS). It is an independent construction standard that assesses and rates the impact of building construction upon the environment.




Penarafan Hijau JKR (pHJKR)

Kriteria Perancangan & Pengurusan Tapak Lestari (TL), Kriteria Pengurusan Sumber & Bahan (SB), Kriteria Kecekapan Tenaga (KT), Kriteria Pengurusan Kualiti Persekitaran Dalaman (PD), Kriteria Pengurusan Kecekapan Penggunaan Air (PA), Kriteria Sustainble Site Planning and Management (SM), Kriteria Environment & Water (EW), Kriteria Access & Equity (AE), Kriteria Construction Activities (CA), Kriteria Material & Resourse (MR) dan Kriteria Pavement Technologies (PT).




GBI is private driven & initiative. The first local GB rating system.  Applied about the same style as LEED from US. According to GBI, they stated the 100 points rating earlier than LEED. More focus to Energy Efficient. 

pHJKR currently apply for JKR and government building. The rating system is about the same with LEED, GBI style.

GreenPASS - standardized all green requirements to CO2 unit. Support PM commitment to reduce 40% carbon emission by 2020. It is an innovation in green building rating system. CIDB have done a comprehensive research and presented for comment from the world GB specialists. 


GO GREEN Malaysia



AsiaAsia didendi olah Mahkamah Australia kerana tidak memasukkan cukai dan lain-lain caj dalam laman sesawangnya.



laman web syarikat AirAsia yang menawarkan pakej tambang murah tetapi dikenakan tindakan denda oleh Mahkamah Persekutuan Australia.

MELBOURNE (Australia) - Syarikat penerbangan tambang murah AirAsia telah dikenakan denda kerana tidak memasukkan cukai dan lain-lain caj dalam laman sesawangnya.

Syarikat penerbangan itu didenda A$200,000 (kira-kira RM600,000) di Mahkamah Persekutuan Melbourne semalam kerana melanggar peruntukan peletakan harga tunggal Undang-Undang Pengguna Australia, kata Australian Associated Press (AAP).

Suruhanjaya Persaingan dan Pengguna Australia (ACCC) berkata, kes itu berkaitan dengan tempoh 10 bulan ketika laman sesawang www.airasia.com tidak menunjukkan beberapa harga tambang penerbangan.

Ia termasuk semua cukai, duti, yuran dan lain-lain caj mandatori dalam cara yang jelas dan sebagai angka tunggal

Monday, December 17, 2012

GBI Certified Building - NRNC

PTM GEO BUILDING

GBI RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0001
CERTIFICATION DATE24 July 2009
BUILDING CATEGORYNon-Residential New Construction (NRNC)

Pusat Tenaga Malaysia (Malaysia Energy Centre), previously known as ZEO (Zero Energy Office) Building is officially Malaysia’s first Green Building Index (GBI) Certified Building.
Now known as GEO (Green Energy Office) Building, it is also Malaysia’s first completed green-rated office building.
Planned as a showcase of energy-efficient building in 2005, it fulfilled this objective as the most energy efficient office building in the country, and in ASEAN, when completed.
Its impressive Building Energy Intensity of 35 kWh/m2/year is about a third of that of the previous most energy efficient building in the country, the LEO (Low Energy Office) Building of the now Ministry of Energy, Green Technology and Water.
Designed at a time when the awareness of building green is still at its infancy in this country, its energy efficient features scored full points under the Energy Efficiency and Innovation criteria of the GBI.
Click on thumbnails below to enlarge images

 

BANGUNAN SURUHANJAYA TENAGA

GBI RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0002
CERTIFICATION DATE21 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

1 FIRST AVENUE

GBI RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0003
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   

DIGI TECHNOLOGY OPERATION CENTRE, MALAYSIA

GBI RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0004
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   


NON-RESIDENTIAL NEW CONSTRUCTION (NRNC)
PROVISIONAL CERTIFIED BUILDINGS (DA)

KRC SALES GALLERY

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0001(P)
CERTIFICATION DATE26 April 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  


MENARA WORLDWIDE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0003(P)
CERTIFICATION DATE26 April 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE HORIZON PHASE 2
(TOWER BLOCK 1)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0006(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 2)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0007(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 3)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0008(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE HORIZON PHASE 2
(TOWER BLOCK 4)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0009(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA BINJAI

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0010(P)
CERTIFICATION DATE30 December 2010
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

   

MENARA FELDA

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0011(P)
CERTIFICATION DATE27 January 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

GTOWER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0012(P)
CERTIFICATION DATE03 March 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

    

HOTEL PENAGA

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0013(P)
CERTIFICATION DATE20 April 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

    

ELKEN DISTRIBUTION CENTRE

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0014(P)
CERTIFICATION DATE23 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

THE SAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0015(P)
CERTIFICATION DATE23 May 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

SARAWAK ENERGY BERHAD

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0016(P)
CERTIFICATION DATE23 June 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE HORIZON PHASE 2
(TOWER BLOCK 7)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0017(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

THE HORIZON PHASE 2
(TOWER BLOCK 8)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0018(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


THE HORIZON PHASE 2
(TOWER BLOCK 9)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0019(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


THE HORIZON PHASE 2
(TOWER BLOCK 10)


GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0020(P)
CERTIFICATION DATE19 August 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

CSF COMPUTER EXCHANGE 5 (CX5)

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0021(P)
CERTIFICATION DATE11 November 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

OFFICE TOWER ON PLOT Z10

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0022(P)
CERTIFICATION DATE30 November 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


3 STAR HOTEL ON PLOT Z10

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0023(P)
CERTIFICATION DATE23 December 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


OFFICE BUILDING AT LOT 2C2

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0024(P)
CERTIFICATION DATE23 December 2011
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


S P SETIA BERHAD CORPORATE HQ

GBI PROVISIONAL RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0025(P)
CERTIFICATION DATE15 January 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


POINT 92 OFFICE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0026(P)
CERTIFICATION DATE15 January 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

MENARA LGB

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0027(P)
CERTIFICATION DATE09 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


LOT E, PLATINUM SENTRAL, KL SENTRAL PARK, CORPORATE OFFICE SUITE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0028(P)
CERTIFICATION DATE09 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


REHDA HEADQUARTER

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0029(P)
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

NTT MSC TECHNOLOGY CENTER

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0030(P)
CERTIFICATION DATE09 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

NTT MSC CYBERJAYA3 DATA CENTER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0031(P)
CERTIFICATION DATE09 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA DARUSSALAM

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0032(P)
CERTIFICATION DATE04 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


SETIA CITY MALL

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0033(P)
CERTIFICATION DATE16 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


MYTELEHAUS CJI

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0034(P)
CERTIFICATION DATE16 March 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images
 

MENARA PEJABAT KEMENTERIAN PERDAGANGAN ANTARABANGSA DAN INDUSTRI (MITI)

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0035(P)
CERTIFICATION DATE06 April 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KL ECO CITY (SALES GALLERY)

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0036(P)
CERTIFICATION DATE04 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

MENARA PUBLIC MUTUAL 

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0037(P)
CERTIFICATION DATE07 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


ART GALLERY & CONSERVATION CENTRE, SABAH 

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0039(P)
CERTIFICATION DATE18 May 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

UNIMAS STUDENT PAVILION

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0040(P)
CERTIFICATION DATE03 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


PROPOSED MOSQUE AT SECTION 13, SHAH ALAM

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0041(P)
CERTIFICATION DATE03 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

BOULEVARD SHOPLEX @ PJ CENTRESTAGE 

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0042(P)
CERTIFICATION DATE13 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

SETIA CITY CONVENTION CENTRE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0043(P)
CERTIFICATION DATE19 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KOMPLEKS KERJA RAYA 2 (KKR 2)

GBI PROVISIONAL RATINGPLATINUM
CERTIFICATE NO.GBI-NRNC-0044(P)
CERTIFICATION DATE19 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


DIALOG HEADQUARTER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0045(P)
CERTIFICATION DATE27 July 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


KAO PENANG OFFICE

GBI PROVISIONAL RATINGSILVER
CERTIFICATE NO.GBI-NRNC-0046(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


VIVATEL

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0047(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

 

JAYA 33 (PHASE 2)

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0048(P)
CERTIFICATION DATE02 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


JAYA ONE THE NEXT PHASE - OFFICE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0049(P)
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


JAYA ONE THE NEXT PHASE - RETAIL

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0050(P)
CERTIFICATION DATE06 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


DESIGNER SUITES @ PJ CENTRESTAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0051(P)
CERTIFICATION DATE24 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

SERVICE SUITEL @ PJ CENTRESTAGE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0052(P)
CERTIFICATION DATE24 August 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images

  

THE PINNACLE

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0053(P)
CERTIFICATION DATE28 September 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
Click on thumbnails below to enlarge images


MERCU MUSTAPHA KAMAL PHASE 3A

GBI PROVISIONAL RATINGGOLD
CERTIFICATE NO.GBI-NRNC-0054(P)
CERTIFICATION DATE19 October 2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
 
Click on thumbnails below to enlarge images


KL TRILLION - OFFICE TOWER

GBI PROVISIONAL RATINGCERTIFIED
CERTIFICATE NO.GBI-NRNC-0054(P)
CERTIFICATION DATE12 November2012
BUILDING CATEGORYNon-Residential New Construction (NRNC)
 
Click on thumbnails below to enlarge images

Related Posts Plugin for WordPress, Blogger...